Daily Work of Concrete Batching Plant

Concrete batching plant is a concrete production equipment, which has played a key role in the construction of modern industry and engineering. In order to ensure the smooth operation and finish certain production task, users should undergo daily inspection of concrete batching plant before operation. Here, Zhengzhou CamelWay Machinery will list it by details as the followings:

concrete mixing station

  1. Check the lubrication of the whole equipment.
  2. Check the oil height in the gas system once a week, and the viscosity of the lubricating oil should be in the range of 2.5 ~ 70 E.
  3. Open the drain valve once a day, which can timely discharge the condensed water in the air compressor and air storage tank.
  4. Check whether the small bolts and nuts are loose or not, and fasten it in time.
  5. Check the water supply, gas supply and admixture system frequently.
  6. Check whether the electric control system and the instrument are in normal condition or not.
  7. Check whether the mixing shaft and the cylinder of concrete mixer are clean or not, and remove the concrete out by hand if there is too much concrete in the mixing shaft.
  8. Users should clean or replace the filter screen in the dust filter timely.

Zhengzhou CamelWay Machinery is an excellent concrete batching plant manufacturer, and the company has many types of concrete mixing plants for customers to choose. If you have any demand, please don’t hesitate to contact us at any time.

 

Get Support Or Price