Demolition sequence of commercial concrete batching plant

concrete mixing station1
1. Dismantle the peripheral board of batching machine and mixing equipment.
  2.Dismantle the cover of feeding equipment and the roof trusses of overall structure.
  3. Dismantle the head mechanical machine of the screw conveyor and belt conveyor and trusses of belt conveyor.
  4. Dismantle all the machine and platform of batching part.
  5.Dismantle the control room and control room support.
  6. Dismantle the respective stairs of discharging hopper, concrete mixer and mixing platform.
  7. Dismantle the stars and uprights of mixing platform and under the platform.
  8. Dismantle the aggregate storage bin and all the belonging equipment as piece.
  9.Dismantle all equipment on the top of cement storage bin and the below framed bent of cement storage bin.
  The above is introduction of the demolition sequence of commercial concrete batching plant, and then check these equipment in order to ensure the integrity and intact of equipment. There must be professional personnel on construction site during the demolition. If you are interested in our products, please leave your name, nation, and your contact way (email, or phone number, whatsapp, skype, viber, wechat). We will give you a reply as soon as possible.