Forced mixer operation and maintenance

Each forced mixer operation has been completed, forced mixer as personnel should tidy up maintenance projects:
1 pack forced mixer mixing tank wall inside and outside of formation, discharging mouth, forced mixer mixing shaft and unloading concrete residue on the door, water will be the local scour clean, put a few stones and water when necessary stir for a few minutes after release.Water washing the car, admixture and its supply system.
(2) the frozen season, forced mixer finished homework should be put to the best of the pump, admixture pump, water tank, additives, water, admixture residual water pipeline, additives, in case of damage to the pump and pipeline, and a water pump of admixture pump work 1 to 2 minutes.
1000mixer
Leading products: commercial concrete mixing plant, large concrete mixing plant, small and medium sized concrete batching plant, stabilized soil mixing station equipment, engineering concrete mixing plant, concrete batching machine, concrete mixer etc products, well received by the masses of users, the best-selling throughout the country.First-class quality, excellent performance, is the company’s consistent purpose, the company abides by the contract, implementation of three packs, the price is reasonable, welcome the broad masses of old and new customers to negotiate the choose and buy.
mixer750

Get Support Or Price