Installation of cement silos in concrete mixing stations

The concrete mixing station in the cement warehouse in the installation process precautions
(1) In the concrete mixing station, the ground bolts of the cement warehouse in the concrete mixing station are poured into the foundation pit. After adjusting the center line of the cement silo bracket and the centerline of the foundation, the above four flanges are adjusted on the same level (measurement method: the theodolite Or diameter 8-10 transparent plastic hose plus color water measurement method), you can choose the concrete pouring. Pre-pit pouring concrete grades should be higher than the base of concrete used in the winter construction, in order to shorten the duration, the use of concrete should be added early antifreeze. To be solidified concrete 5-7 days before the installation of cement warehouses, cement warehouse installation, the need for the use of theodolite on the cement body vertical measurement, the vertical degree of one thousandth of the height. To shorten the duration, the infrastructure can also be used to replace the anchor bolts with embedded parts to fix the cement bin or mixer.


(2) the installation of the mixing plant in the concrete mixing station: the mixer under the chassis of the appropriate appropriate pad, with the hinge will be connected with the host and the bridge, installed cement scale, water scale, additive scale, you can lift, measurement And adjust the host chassis, so that in a horizontal state, the center line of the legs and the center line after the center line can be filled with anchor bolts in the pit (or the base and the embedded parts of the welding).
(3) the installation of other parts of the concrete mixing plant: concrete mixing station in the host and the cement tank after the installation of the installation, you can install the screw conveyor, before lifting, check the lubrication point filling oil and grease, to be empty Test, find the problem in time to solve the installation of parts of the machine, according to the requirements of the base map in place, a small batching machine placed in a solid foundation pier can be on the surface, large batching machine requirements pouring anchor bolts, the mechanical part of the installation of the end , Check all the lubrication points of various equipment with lubricating oil (winter in winter to be replaced for low temperature conditions of lubricating oil) or grease, you can according to the instructions and electrical schematic diagram of the wiring and the empty running test.

Get Support Or Price