Installing details of concrete batching station with mixing console

Before installing concrete mixing station, users should check all the installation equipment and installation tools whether they are complete and there are security risks, then install the program. When the concrete mixing plant is installed, the most important thing is to pay more attention to the safety, each employee must be equipped with a safety tool. We should ensure that there is no body near any equipment of the concrete mixing plant, especially below. When lifting there must be professional staff to direct it.
concrete mixing station1
The above security measures have been taken, then it can install the concrete mixing plant. When it is installing, we can check installation dimension and correct deviation randomly, any equipment of the concrete mixing plant should be connected firmly after lifting and after careful examination, the flange joint surface and the discharging pipe flange joint surface should be coated with sealed objects.
When install weighing hopper, we should ensure the safety of the sensor, when install gas cap and valve, we must check firstly and the hose joints can not leak. When it is installing, each of the equipment of the concrete mixing plant should avoid collision, it should ensure that bolt nut and the welding place are firm.
Zhengzhou CamelWay Machinery manufacture produces tower cranes, construction elevators, concrete mixing stations, JS concrete mixers, concrete batching machines, stabilized soil mixing stations, wheel loaders, concrete transport tanks, JZC concrete mixers and other construction machinery. For more information about any of our products, please feel free to contact Zhengzhou CamelWay Machinery via email or at the contact addresses available on this website.

Get Support Or Price