What should pay attention on concrete mixers

mixer
1. The first is installation. The concrete mixer should be set in the flat position, use the wood mat up front and rear axles, the tire is put aside high overhead, so as not to walk in when the.Fixed mixer in a fixed base or chassis.
2. Review: concrete mixer after power on, and must be carefully checked by 2 ~ 3 min empty running in thought after passing before use.Commissioning should check when mixing drum speed whether appropriate, under normal circumstances, the proportion of empty car speed car was faster (after loading) 2 ~ 3, such as the difference is more, should adjust pulley and the proportion of the driving wheel.
The rotation of the mixing drum direction should comply with the direction of the arrow, if not, should be corrected motor wiring.
Check whether the transmission clutch and brake is flexible and reliable, wire rope is damaged, track pulley are in good condition, surrounded by accessibility and lubrication situation of each part.
3. Maintenance: after start up, often pay attention to the blender parts is normal operation.Often check whether mixer blade bending when stop the machine, screw ever strike or loose.
If you are interested in our products, please leave your name, nation, and your contact way (email, or phone number, whatsapp, skype, viber, wechat). We will give you a reply as soon as possible.